Tochigi Prefecture Dam

0559- Ikari Dam/Ikari Dam

5.0
0559- Ikari Dam/Ikari Dam Tochigi Prefecture Dam
This article can be read in about 7 minutes to read.

Location: Kawaji Onsen Kawaji, Nikko-shi, Tochigi
Date of interview: Saturday, October 02, 2010

View of the conduit from the observation platform on the right bank

This rounded, feminineconduitOh, my God!

View of the conduit from the observation platform on the right bank
View of the conduit from the observation platform on the right bank

View of the crest from the observation deck on the right bank

Plus, here's another rounded crested section!

View of the crest from the observation deck on the right bank
View of the crest from the observation deck on the right bank

View of the reduction work from the observatory on the right bank

And this abatement and conduit!

View of the reduction work from the observatory on the right bank
View of the reduction work from the observatory on the right bank

View of the levee from the observation deck on the right bank

Fifty miles from Tokyo Nihonbashi. At last, here we are at the Gojuri Dam!

View of the levee from the observation deck on the right bank
View of the levee from the observation deck on the right bank

View downstream from the observatory on the right bank

There is a hot spring resort downstream and the atmosphere looks nice. If possible, I would like to stay there for a long time.

View downstream from the observatory on the right bank
View downstream from the observatory on the right bank

Information sign and stone monument at the observatory on the right bank

It is a magnificent sign and stone monument. The sign in particular was designed to evoke history and contained information about the surrounding area and the Gojuri Dam.

Information sign and stone monument at the observatory on the right bank
Information sign and stone monument at the observatory on the right bank

Since there is still some time left, I decided to go downstream before the top of the dam, but unfortunately, it was under maintenance work that day, so I could not visit the dam.... So, it was time to go to the control center to get a dam card.

Entrance to the Gojuri Dam Management Office

... and then you can't get in.

Entrance to the Gojuri Dam Management Office
Entrance to the Gojuri Dam Management Office

The time was around 8:30 a.m. It seemed that tours were available from 9:00 a.m. I had a next appointment. Since I had my next appointment, I ping-ponged and asked if I could at least visit from the top edge, but it was a no-go.

Gojyuri Dam Management Station

However, they opened the door 10 minutes before. I apologized for rushing him and got the dam card.

Gojyuri Dam Management Station
Gojyuri Dam Management Station

View of the top edge from the right bank

I was the first one to arrive on this day. w
There's no one here!
You can enjoy the Gojuri Dam to the fullest!

View of the top edge from the right bank
View of the top edge from the right bank

The Gojuri Dam was completed in 1956 (Showa 31), and although it is a rather old dam, it gave the impression of being properly utilized while being maintained. It was the first dam in Japan to exceed 100 m in height, and at the time, it was the tallest dam in Japan.

In addition, to give a brief history of the construction of the Gojuri Dam, the construction plan started in 1926, excavation began in 1929, a fault was found in 1933 and construction was temporarily halted, construction started again in 1941 despite flood damage, and construction was suspended in 1942 due to the war...it seems to have been quite a difficult history.

And I was afraid to plan a 100-meter high dam in the Taisho era.

View of the levee downstream from the right bank

The Gojuri Dam does not have stairs installed in the footing, but rather a catwalk like an arch dam, which can be used to patrol downstream.

View of the levee downstream from the right bank
View of the levee downstream from the right bank

Downstream face and standard cross section of the Gojuri Dam

I couldn't see it from the front, so I studied this drawing and others.

Downstream face and standard cross section of the Gojuri Dam
Downstream face and standard cross section of the Gojuri Dam

In the center of the embankment is the "oldconduit gateThe gate can only be operated in two ways, fully open or fully closed, and its water discharge capacity is low at about 100 tons per second, making it very difficult to adjust the water level. Therefore, a new conduit gate with a capacity of 500 t/sec was installed on the right bank side. Of course, the gate can be partially opened.

Function of the Gojuri Dam [Flood control

The detailed construction of the new conduit gate isKajima websiteYou can see it at Anyway, I read this and was very impressed.

Function of the Gojuri Dam [Flood control
Function of the Gojuri Dam [Flood control

And this graph gives an idea of how difficult it was to control flooding with the old conduit gates.

Annual storage level curve of the Gojuri Dam

This is evidence of when the Gojuri Dam did its best in 1998. The new conduit gate was completed in 2003, so it was still being adjusted with the old conduit gate.

Annual storage level curve of the Gojuri Dam
Annual storage level curve of the Gojuri Dam

Kinugawa River Upper Stream Dam Group Linkage Project

What is really interesting is the "Kinugawa Upper Kinugawa River Dam Group Linkage Project. This project is to form a "dam-to-dam network" by directly connecting the Gojuri Dam and the Kawaji Dam, which is right next to it, with a 1.1 km long, 3 m inner diameter water pipeline.

Kinugawa River Upper Stream Dam Group Linkage Project
Kinugawa River Upper Stream Dam Group Linkage Project

Kinugawa upper stream dam group cooperative facility

This allows for the pumping of up to 20 m3/s of water to the Kawaji Dam, which has a large storage capacity, in the event of an inflow that the Gojari Dam is full and cannot store water, and conversely, in the event of a shortage of river maintenance flow immediately below the Gojari Dam or in the Kinugawa River main channel, water can be pumped from the Kawaji Dam to the Gojari Dam in coordination. This is said to be the case.

Kinugawa upper stream dam group cooperative facility
Kinugawa upper stream dam group cooperative facility

The Gojuri Dam and Kawaji Dam do not operate separately, but rather both work together to protect the downstream...that is the image I have in mind.

Each one is a mere fire, but when two overlap, they become a big flame. ...Well, in this case, it is water.

So it is understandable that even old dams are properly utilized in this project.

incline

This incline also looked like it had just been maintained and was quite beautiful.
I'd like to see the patrol boat appear on the scene. w

incline
incline

View of the reduction work from the top of the right bank

You are in the middle of a river maintenance discharge.
Also, the structure on the right bank is the new conduit gate. The area downstream of this conduit gate is currently under construction and is inaccessible, but I heard that you will be able to walk around after the construction is finished, so I would definitely like to revisit the area to take a closer look at this conduit gate.

View of the reduction work from the top of the right bank
View of the reduction work from the top of the right bank

View of Gate Pier

This is a gate pier that feels quite stumpy. It feels like the gate hoisting room is on top of the dossier.

View of Gate Pier
View of Gate Pier

View of roller gate

It is 10m wide by 5.2m high (this is the upper door height and the lower door height is 8.3m, for a total of 13.5m and a two-step gate). The roller gate of the crest gate of the "Crest Gate" is also as stately as you can see. It even has a sense of style. Incidentally, it was made by Hitachi Zosen.

View of roller gate
View of roller gate

There are a total of three crest gates. They can discharge a maximum of 300 m3/s.

Spare gate door body?

I believe this is a spare gate door body for the old conduit gate.

Spare gate door body?
Spare gate door body?

Birds - I don't know what kind.

A bird at the edge of the sky.
But I don't know what it's called.

Birds - I don't know what kind.
Birds - I don't know what kind.

View of the reduction work from the top edge

If only downstream wasn't under construction.... I think that over and over again when I look at this picture, but it can't be helped.
More interesting is the contrast between the oldness of the dike and the newness of the new conduit gate.

View of the reduction work from the top edge
View of the reduction work from the top edge

View of the dam lake from the top near the left bank

The dam lake seems thin compared to the size of the embankment, which is no wonder it is linked to the Kawaji Dam.
But what a blue sky!

View of the dam lake from the top near the left bank
View of the dam lake from the top near the left bank

View of the top edge from the left bank

Don't dams and blue skies go well together?

View of the top edge from the left bank
View of the top edge from the left bank

Stone monument placed on the right bank

Let's put our hands together at the cenotaph.
A moment to remember the hardships of our predecessors....

Stone monument placed on the right bank
Stone monument placed on the right bank

View of the embankment on the lake side from the right bank

The conduit gate is on the right and the crest gate on the left.
The concrete surface is colored to evoke a sense of history, giving the dam a stately appearance.

View of the embankment on the lake side from the right bank
View of the embankment on the lake side from the right bank

View of the dam lake from the right bank

Upstream of this dam, the Yunishigawa Dam is under construction. One can only hope that in the near future, the old and new dams will work together like this to regulate flooding!

View of the dam lake from the right bank
View of the dam lake from the right bank

dam characteristics

River NameTone River System Oga River
ObjectiveFlood control, agricultural disaster prevention, unspecified water, river maintenance water, power generation
Modelgravity-fed concrete dam
Bank height112m
Bank length267m
Dam volume468,000m3
Watershed Area271.2 km2
Reservoir area310ha
Total storage capacity55,000,000m3
Effective water storage capacity46,000,000m3
Dam operatorKanto Regional Construction Bureau
Main body constructorKajima Construction
Year of launch1941.
Year Completed1956
Name of Dam LakeIkariko (Lake Ikari)

Other facilities/observations

Parking is available at the observation deck on the right bank and next to the administration office. After the downstream maintenance, it may be possible to park here as well. However, the parking lot next to the management office opens only from 9:00 am.

Parking lot
Toilet
Park×
PR Exhibition Hall
Fishing

Accommodations that may be close to Gojuri Dam

Kinugawa/Kawaji/Yunishikawa/Kawamata Hotels and Inns Reservation (Rakuten Travel)
Rakuten Travel - Book hotels and inns in Kinugawa, Kawaji, Yunishikawa, and Kawamata! From popular business hotels and city hotels to ryokan (Japanese-style inns), we have a full lineup of hotel information, including customer comments!
Booking.com: 検索結果. 今すぐホテル予約!
This article was written by.
Shin Jinma

Dam enthusiast who loves Momosuke Fukuzawa / Dampedia and Dam News administrator / Certified Dammeister (01-018) by the Japan Dam Foundation / Started selling discharge caution goods.https://shop.dampedia.com

Follow Damapedia

Comment

Copied title and URL