
1225-Ono Headworks
Date of interview: 2012/08/05(Sun)The Ohno Headworks is responsible for taking in up to 30 m3/s of water from the Uren Dam and Oshima Dam as its water source. A "headwall" is an intake or weir structure used to take in water from a river, mainly for agricultural use. A headwall is a structure with a bank height of 15 m...