Introduction of dams and weirs mainly in the Chubu region, images, driving courses around dams, types of dams, dam terminology, etc. Please use this site to study civil engineering architecture and plan your dam tours and drives.
This article can be read in about 1 minutes to read.
Reading: Kouzuichou setsuyouyouriou Also known as -
Flood control capacity is the capacity from the constantly full water level to the surcharge water level. Flood control is carried out within this capacity. In particular, during flood periods, the water level is lowered to the flood stage limit to ensure the volume of water flowing into the dam. A dam with no flood control capacity has no flood control function.
Comment